5STARTRANS with more than 10 years of experience in transporting and moving machines, putting machines in place for Korean, Japanese, French, and Taiwanese projects in Vietnam, we approach each project and offer a practical plan. currently transporting, with the most complete technical team and auxiliary vehicles. It is these things that make up the confidence as well as the ability to complete projects of lifting and lowering machinery.
» Package import service includes: customs clearance, transportation to the factory, dismantling the parcel, putting it in place by forklift, crane
» Packing service for export : Bringing machinery out of the factory, packing wooden cases, vacuuming, packing into containers, lashing, transferring domestically and internationally
» Raise equipment from container, hoisting equipment and machinery onto the building, down the tunnel, into position….
» Relocate machinery and equipment from one location to another, from the old factory to the new factory
» Crawling equipment to high positions, to buildings, terraces….
» Put machinery down the tunnel, slope, put into position according to drawings….
» Crawling and moving large, oversized, overloaded, super-long, super-weight machines to the required installation position
» Factory relocation
» Positioning and Aligning equipment according to factory drawing design
» Alignment of eccentric, out-of-aperture machinery
Record all customer requests.
Surveying the current status of the works, the location of equipment and machinery installation.
Measurement calculates costs that may affect lead time costs.
Make specific plans, plans for loading and unloading, lifting and lowering and choose the most optimal plan.
Tính toán các phương tiện xe nâng, xe cầu, công nhân, kỹ thuật, và các công cụ cần thiết , phương án bảo vệ sàn hay các công trình khác.
Present the best options, provide service prices as well as completion time.
Team meeting to disseminate the plan, remind the uniqueness of the project, Regulations of the project for the whole team to grasp and implement
Perform the work as planned with the close supervision of the Team Leader
Safety is the most important factor to be controlled during implementation
Strictly adhere to the principles of safe operation of equipment
Carry out final inspection and handover of project items, pay costs according to the contract.
HCM Office : No. 5-7 Hoang Viet Street, Ward 4, Tan Binh District, City. Ho Chi Minh, Vietnam
Dong Nai Office : 45/13 Quarter 3, An Binh Ward, Bien Hoa – Dong Nai
Binh Duong Office : Road A 1, Vietnam Singapore Industrial Park, Thu Dau, Binh Duong
1. DONG NAI BOSCH COMPANY
2. LOCK AND LOCK COMPANY IN NHON TRACH DONG NAI Industrial Park
3. TODA COMPANY – VSIP 2A Industrial Park – BINH DUONG
4. MITSUBA COMPANY – LONG BINH AND AMATA
5. FRAMAS COMPANY – LONG THANH IZ – DONG NAI
6. NIDEC COPAL COMPANY IN HI-TECH AREA DISTRICT 9
7. SAMSUM COMPANY IN THU DUC
8. KYODO COMPANY, DONG NAI AMATA Industrial Park, PRINTING SYSTEM
9. NAGAE COMPANY, LONG DUC IZ DONG NAI, DUCKING MECHANICAL PROCESSING SYSTEM
10. DONG JIN VINA COMPANY BIEN HOA 2 Industrial Park
+ We put the responsibility for the safety of machinery and goods on top, being careful in every move as well as planning to avoid any problems during the working process.
+ Fully equipped vehicle system including: Forklift (2 tons, 5 tons, 12 tons), Cranes (small cranes, cranes with a tonnage of 40 tons to 65 tons), system Winch system, hand pallet truck, hand truck, dwarf trailer, floor, roller, roller, hydraulic roller, floor protection tool… are imported genuine.
+ Over 10 years of experience with large projects for Japanese partners (accounting for 70%) in addition to Korea, Taiwan, UK, etc.
+ Competitive costs, accurate quotes for each project and guaranteed project progress as committed